URGENT TECHNICAL SOLUTION PROVIDED FOR RECOVERY OPERATION
Following the supply of a full back-deck spread that included 3 hydraulic drum winches for a cable lay installation, Motive Offshore was again commissioned by the same major subsea contractor to provide an urgent solution for recovery of the product subsea after it had become damaged.
Overview
200Te SPOOLING WINCH
CUSTOM-MANUFACTURED REEL
Motive offered a 200Te Spooling Winch and custom-manufactured reel with a core diameter of 2.8mtr to accommodate the minimum bend radius of the product to be recovered.
Our in-house team fully designed, engineered, and loaded out a suitable reel, from raw steel through to end product within just 7 days.
This project demonstrated Motive’s ease and ability to deliver a technical solution, working expertly to bring the project from concept to reality within an extremely limited timeframe.
Additional products and services to supplement the project included:
- Reel Lifting Arrangement
- 10Te Winch
- Personnel to commission/install equipment
- Transportation direct to the mobilisation site
7 Days
Solution designed, manufactured, and supplied within just 7 days
Well-equipped Facility
No job too big or too small
Bespoke
Innovative design and engineering solutions

The client was happy with the service received, with the Lead Engineer commenting on the proactive approach taken by Motive to provide a viable solution: