SINGLE-SOURCE SUCCESS FOR UMBILICAL & CABLE LAY SYSTEM

Motive delivers a complete Reel Drive Lay Solution for multi-campaign Angolan Project.

Overview

EQUIPMENT SUPPLIED

500Te Reel Drive System (RDS)

Control Cabin

Level Wind (modified for project requirements)

Roller Boxes

Linear Cable Engine

Cable Pulling Machine

20Te Winch

Chutes

15Te Tensioner

350Te Under Rollers

Deck Deflector

Spare Reel

Location: Quiluma & Maboqueiro Fields, Offshore Angola

Duration: 5-Phase Campaign handling approx. 52km of product

Following previous collaborations with Aquatic (acquired by Motive Offshore Group in 2024), our client entrusted Motive with the provision of an Umbilical and Cable Lay System for a major project campaign, recognising our proven track record and established capability in SURF and cable handling equipment.

Motive 500Te Reel Drive System handling 52km of product during multi phase Angolan campaign


THE CHALLENGE


To eliminate costly schedule risk, the client required an absolute guarantee of immediate mobilisation for the extensive equipment spread, demanding technical readiness well in advance of the planned offshore dates.

Through rigorous, proactive logistical planning and testing schedules, the full spread (including the 500Te Reel Drive System) achieved assured operational readiness, remaining deployable and prepared for loadout well ahead of the client's collection schedule, guaranteeing project continuity.

Our Solution

Spanning five distinct campaigns - FOC Piggyback, FOC Transpooling, LCV Umbilical, J-Tube Pull, and FOC Splicing - Motive delivered an end-to-end solution supplying a wide range of equipment, alongside a team of 8 Multi-Disciplined Personnel.

The engineering phase for the umbilical lay scope included custom-modification of the Levelwind guides to match the specific product dimensions and existing deck arrangement.

Providing full project management, Motive expertly handled the significant volume of planning and documentation required.

Results

The strategic response implemented by Motive led to successful project outcomes:

Optimised Resource Mobilisation
Leveraging our extensive rental fleet and highly skilled operational teams ensured comprehensive support across multiple project campaigns.

Proactive Technical Integration
Detailed upfront engineering and close client collaboration ensured smooth equipment integration.

500 Te Reel Drive System and 15 Te Tensioner setup for Umbilical Lay during campaign 3
Motive Under rollers Reel

500Te Reel Drive System and 15Te Tensioner setup for Umbilical Lay during campaign 3 and Transpooling of Fibre Optic Cable using Motive 350Te Under Rollers and Reel

This multi-phase umbilical and cable lay project was highly significant for Motive. Our ability to support multiple campaigns - powered by our extensive equipment spread, expert operators and project management capabilities - demonstrates our strength in this sector.

Proactive and continuous collaboration with our client, both pre-mobilisation and during the project, allowed us to apply our specialised knowledge ensuring successful project outcomes throughout.

- Neil Rankin, Head of Delivery (Projects)